Multimodal transportation of equipment with more than 100 units, total weight 2500 tons, moving via route S.Petersburg – Salavat. Sea, river and road transport was engaged during the transportation. Temporary customs control zone was opened. Maximum dimensions: diameter – 8,8 m, height – 4,7m, total weight – 275 tons. The realization of this project required bridge structure strengthening, lifting of the high voltage transmission lines, development of the RO-RO quay.